Reconstruction of Lignite fired boiler of 150 MW in Unit 3 Power Plant
The project involves the reconstruction of the Lignite fired boiler of the Power Plant with an output of 150 MW
The project involves the reconstruction of the Lignite fired boiler of the Power Plant with an output of 150 MW