KALLIDROMO RAILWAY TUNNEL

CONTRACT VALUE
€ 223.000.000
CONTRACT DURATION
09/2006 – 07/2013

Kallidromo railway tunnel is part of the New High Speed Railway (200km/h) Tithorea – Lianokladi.

The contract title was «Remaining works for the completion of the Kallidromo Tunnel, earthworks and other works for the New High Speed Railway Tithorea – Lianokladi, section from Tithorea Station (K.P. 0+000) to K.P. 19+000».

The project was about the construction of two single line rail tunnels of 18.071m total length as well as the construction of the connection tunnels between the two main tunnels every 500m.

The construction works were completed through a joint venture form and held out by two construction sites, South site in Tithorea and North site in Komnina on the way to Molos railway station in Fthiotida.