Salamina’s Sewage Disposal in Psyttalia WWTP

CONTRACT VALUE
€ 3.870.000
CONTRACT DURATION
1999 - 2002

Pre-treatment works: Screening Unit, Sand Removal Unit,, Overflow works, Blowers unit, Washing tower, Valves Chamber, Administration Building.

PVC onshore pipeline for the disposal of the treated wastewater Φ250 10atm. Total length : 3.259,22 m.

PVC Washing pipes Φ110 10atm. Total length: 2.924,83 m.

Two submarine disposal pipelines, 3rd generation HDPE Φ630 6atm Total length 2×1.050m.

Submarine pipeline for treated wastewater, 3rd generation HDPE Φ630 10atm Total length : 1.066m.

Search: