Design and construction of Sludge Drying Plant at Psyttalia Wastewater Treatment Plant
CONTRACT VALUE
€37 millions
CONTRACT DURATION
2006 - 2008
PSYTTALIA ISLAND, GREECE
The Unit consists of four parallel drying lines with rotating drums.
Each drying line has an evaporation capacity of 8,625KgH2O/h with a maximum capacity of 9,200KgH2O/h.
Nominal dehydration capacity at 4*250tnDS/day, with 20% – 32% DS sludge concentration.
The final product, the “dried sludge”, is collected in four storage silos.