Waste-Water Treatment Plant at SES Megalopolis – Units I, II, III
CONTRACT VALUE
4.450.000€
CONTRACT DURATION
2003 – 2008
GREECE
Design and construction of a complete system for the treatment of industrial waste water generated by the operation of the three units (I, II and III) and the auxiliary facilities of the Megalopolis Power Station, and the rainwater collected from the power plant facilities and areas around them, to meet the legal requirements pertaining to the disposal of treated waste water in the Ligatari River.
Total Capacity: 1,200m³/h.