The project involves the two stages of engineering and construction of a complete LNG station in Revithoussa island in Greece with a net LNG capacity of 2×65,000 m3 and an evaporating capacity of 1,250 m3/hour

It includes:

– Engineering, Materials Supply and Erection, Precommissioning, Commissioning, Start-up and Performance Test of two 70m diameter x 26m height, double-containment tanks of 65,000m³ capacity each, pre-stressed concrete construction of outer tank with vapor barrier steel lining, and 9% nickel inner tank, dome steel roof erected by means of air lift.

– Cryogenic Installations and Utility Systems for the Liquefied Natural Gas Terminal on Revithoussa Island including:

– Marine jetty to berth LNG tankers up to 140,000m³ capacity with unloading arms, equipment for pumping and transferring the LNG to the storage tanks, high pressure cryogenic pumps to re-gasify the LNG (250m3/h SMSR & 500m3/h peak), open rack vaporizers (sea water and submersion), sea water intake for vaporizers and fire fighting system, heat recovery, administration and auxiliary buildings and slope stabilization.

Search: