Contract Value:
EUR 10 million
Contract period:
2009-2014

PROCUREMENT & INSTALLATION OF THE ETHERNET NETWORK & TERMINAL EQUIPMENT, GREECE.

This included the design, construction, financing, operation, maintenance and exploitation of the Korinthos-Tripoli-Kalamata motorway and the Lefktro-Sparti branch as well as procurement and installation of Ethernet Network and terminal equipment. The Moreas ethernet network consists of:

  • 60 fibre optic cables installed along the entire 150km motorway route.
  • 14 telecommunication network nodes with operating speeds of up to 10G, with installation of active equipment capable of routing data MPLS/IP for the project’s operational needs.

 

Search: