The ICGB Project – Natural Gas Interconnector Greece-Bulgaria

Contract Value:
Euro 145 million
CONSTRUCTION PERIOD:
2019 – 2022

GREECE – BULGARIA

The ICGB gas pipeline, which is to be connected to the Greek national gas transmission system in the area of Komotini and with the Bulgarian national gas transmission system in the area of Stara, Zagora.

The pipeline will have a length of 182km, diameter of 32” and a projected capacity of up to 3 bcm/y in the direction running from Greece to Bulgaria.

Depending on interest from the market and the capacities of the neighboring gas transmission systems, the pipeline is designed to increase its capacity up to 5 bcm/y, thus allowing physical reverse flow from Bulgaria to Greece with the additional installation of a compressor station.

Search: