LNG Tank of 95,000m³ storage capacity
Contract Value:
Euro 98 million
Period
06/2013 - on going (construction period 34 months)
REVITHOUSSA ISLAND, GREECE
The project consists of the detailed engineering (i.e. process, process safety, civil, structural, mechanical, equipment, electrical and I&C design), procurement of materials and equipment, construction, commissioning and initial operation of a new LNG tank (full containment type) of 95.000m³ net capacity and its interconnection with the existing unloading and degasification facilities as well as with the existing electrical network the DCS and ESD of the plant, the fire and gas detection systems, the fire-fighting ne2rk and the utilities network.