Arabian Light Crude Increment II

Design, supply and construction of earthworks, construction of two gas turbines 25MW, exhaust systems, interconnecting piping, tanks, pipe racks, pumps, drums, etc. 36KV substation, high and low voltage power distribution, earthing, cathodic protection, control room equipment and I&C works.

Search: