239MW Combined Cycle Power Station (Unit 5)
VASILIKOS, CYPRUS
The EPC contract includes the engineering, construction and handing over of a 239MW combined cycle power plant in two phases. The first phase involves the handing over of two 75MW gas turbines within 22 months. The second phase involves the handing over of two HRSGs, an 80MW steam turbine, and the balance of the plant.